MOXY Hotel

  • München
  • Vastint
  • Andrew Horwitz
  • 6000 m² - 5 Stockwerke
  • 2018
  • Structural design, construction planning, concrete work, assembly of the rooms, mechanical and electrical installations, installation of the sprinkler system, roofing, façade cladding, flooring, drywall, doors, landscaping.