floating cultural monument
In just six months, Ganter managed to bring the beauty of the floating cultural monument to radiant life again. In order to implement the art déco concept, Ganter completely hollowed out the 530 m2 motor vessel, removed the asbestos and finally rebuilt, converted and renovated the ship, taking into account the interior elements under heritage protection.
All the floors were removed and relaid, and individual walls and roofs were re-installed. In the process, the ship was equipped with up-to-the-minute technology, new electrical installations and sanitary facilities. Vibration decoupling was used in the construction to protect people on board from unpleasant vibrations, noise and disturbance sources.
More information about the project can be found in our background story on our blog.