Longchamp Flagship Store Munich

  • München
  • Longchamp | Giuseppe Galioto
  • Longchamp | Giuseppe Galioto
  • Longchamp
  • 340 m²
  • 2022
  • Complete interior construction as general contractor

Relax, we care!

Ganter took on both the general contractor and shopfitting work for the renovation of the 340 m² shop, which extends over the ground floor and first floor. Involved in the development process from the very beginning and with the knowledge of the now more than 10 years of cooperation, the Ganter project team supported with expertise and know-how to implement the construction process in the best possible way and on schedule. As part of the conversion, the floor was renewed and the ceilings and walls, including light coves and recessed luminaires, were overhauled. At the same time, the necessary connections for the electrification of the existing and the new state were prepared in close coordination.

'A particular challenge was the European Championship taking place in and around Munich at the same time as the expansion, with the triathlon running directly through the construction site on Residenzstraße. Through our careful planning and a clean implementation of the trades, our team was nevertheless able to ensure the successful completion of the project.'

Daniel Sum Business Team Manager, Ganter Group