Lynk & Co Club

  • Amsterdam
  • S-P-A-C-E
  • Today’s brew / Lynk & Co
  • 450 m²
  • 2020
  • Surveying, finishing, drywall construction, sandblasting, painting, project management, construction management, coordination of external suppliers, sampling, shopfitting, free-standing furniture, merchandise, metal construction work.

Improvement through sustainable materials

During the conversion work, we focused on preserving the existing structure, which thus also allows a view of the time layers of the building and its construction history. Another focus was the use of sustainable and upcycled materials. An ongoing value engineering process enabled Lynk & Co to develop optimal solutions for several interior design elements: for example the approximately 7-metre wide staircase of the stage – or the ceiling / wall construction of the orange VIP room which spans of over 3 metre. Here, instead of a solid steel construction, a wooden construction with Kerto veneer plywood panels was executed, which was provided with a special filler and suits the interior concept with a realitic concrete look. This solution reduced costs and optimised sustainability, as the construction was easier to manufacture and assemble and can be easily dismantled and recycled if necessary.
Always different, always new – we are excited to look forward to the realisation of the next Lynk & Co. Club in Gothenburg.